In accordance with Chapter 23, Section 23-3, the City of Hallandale Beach seeks to pre-qualify General Contractors for the construction of the Main Fire Station to be located on 111 Foster Road, City of Hallandale Beach, FL 33009. Pre-qualification is a procedure by which a General Contractor may qualify to bid on the above mentioned project. Only contractors that have been determined by the City to be pre-qualified as provided under this RFQ are eligible to bid on the Main Fire Station Project. It is anticipated that the proposed fire station be approximately 23,000 – 25,000 square foot two story facility with four (4) double apparatus bays. The facility will have adequate living space for a minimum of ten (10) on duty firefighters, including living, cooking, sleeping, teaching and training space. The building will also include the administrative offices, emergency operation center, meeting and training space, as well as, potentially a City wide camera monitoring room. All necessary accommodations for emergency activation events. The building shall be constructed to provide critical infrastructure and shall achieve the U.S.
Green Building Council LEED (Leadership in Energy and Environmental Design) Certification or equivalent green building certification.
EXHIBIT I
EXHIBIT II
EXHIBIT III
EXHIBIT 1 – SAMPLE OF CBP
ATTACHMENT A
NON-MANDATORY ATTENDEE SIGN-IN
ADDENDUM #1
ADDENDUM #2